
PROJECT OVERVIEW
Service Type: Fit-Out
Industry Sector: Commercial
This project consisted of the fit-out of a six-storey office block (13,700m²) over a double basement (4,500m²) with Sisk. Castle had previously worked on the shell and core under a separate contract, which overlapped with the fit-out works. This was a tight city centre site with streets on three sides and an office restoration on the remaining side which was also carried out by Sisk. Access was via a rear ramp to the basement and an internal hoist in the central atrium gave access to each floor.
As part of the fit-out Castle supplied and installed Gyproc partitions and ceilings, a large SAS tartan ceilings package across all floors along with hygienic SAS ceiling systems in the kitchen and canteen areas and acoustic ceilings to the boardrooms. The project achieved LEED Gold accreditation.




















